Friday, November 29, 2024

Transformation at Leeds City Station reaches next milestone

The transformation of Leeds City Station’s main entrance is reaching its next milestone, with demolition works coming towards the end and construction due to begin in earnest in the New Year.

The Leeds City Station Sustainable Travel Gateway scheme is being delivered at the same time as essential maintenance work by Network Rail to reinforce the underground structure below New Station Street, which supports much of the station above it.

The previous cycle hub and rotunda steps outside the station have been demolished and a total of 13 iron beams – each weighing as much as 40 tonnes – are being removed to access a huge underground space known as the Mill Goit, a man-made channel off the River Aire which took the stream to power a nearby mill. When the station was originally built in 1869, New Station Street was built as a bridge over the Mill Goit.

Piling works are now beginning which will allow for the Mill Goit to become home to the station’s new cycle hub, and for wider construction to begin. This includes the two passenger lifts providing access between New Station Street and Bishopgate Street, and the pedestrian improvements which will create a much-improved and more people-friendly gateway to the city centre.

Delivering the Sustainable Travel Gateway scheme in tandem with the maintenance works will reduce longer-term disruption and provide value for money by reducing the need for further works at a later date.

The £46.1m Sustainable Travel Gateway scheme is being delivered by Leeds City Council on behalf of Network Rail as the landowner, and in partnership with the West Yorkshire Combined Authority. The scheme is funded and being delivered through the Combined Authority’s Transforming Cities Fund programme, which is aimed at making it easier for people to walk, cycle and use public transport.

This week colleagues from the Combined Authority, Leeds City Council and Network Rail were given a tour of the works by constructor partner Balfour Beatty.

Councillor Helen Hayden, Leeds City Council’s executive member for infrastructure and sustainable development, said: “It’s amazing to see the scale of work involved in delivering these schemes, which will create a safer and more people-friendly gateway between the station, the city centre and the wider south bank.

“We thank everyone for their patience as we work towards construction continuing into the new year, and completion in 2025.”

Paul Buchanan, Balfour Beatty’s Project Manager, said: “Today marks yet another milestone in the transformation of Leeds City Station, with demolition works nearing completion.

“We now look forward to starting main construction, working closely with Leeds City Council, Network Rail and the West Yorkshire Combined Authority, to bring the new gateway to life and provide an accessible and vibrant new link between the station and the wider city centre.”

The Sustainable Travel Gateway scheme will create a much improved and more people-friendly environment that can accommodate growing rail passenger numbers and ensure people can enter and exit the station safely.

The scheme will see:

  • New Station Street pedestrianised, including the section which meets Boar Lane, with outdoor seating, rest areas, and landscaping.
  • The taxi rank located to Bishopgate Street with a large and well-lit shelter and room for six vehicles, allowing for kerb-side boarding to help people with wheelchairs or assistance dogs to board more easily.
  • Two 21-passenger lifts from Bishopgate Street to the station entrance on New Station Street, providing step-free access between the two streets.
  • A high-quality cycle hub with electric charging points and storage for all types of cycles.
  • Environmental improvements to Neville Street and Dark Neville Street including enhanced lighting and road surfaces. Works on the east side of Neville Street have been completed, with works on the west side of Neville Street and Dark Neville Street currently on-site. Once completed, these will offer safer routes for pedestrians and cyclists.
  • Installing high quality cycle infrastructure on Bishopgate Street and Neville Street.

A message from the Editor:

Thank you for reading this story on our news site - please take a moment to read this important message:

As you know, our aim is to bring you, the reader, an editorially led news site and magazine but journalism costs money and we rely on advertising, print and digital revenues to help to support them.

With the Covid-19 pandemichaving a major impact on our industry as a whole, the advertising revenues we normally receive, which helps us cover the cost of our journalists and this website, have been drastically affected.

As such we need your help. If you can support our news sites/magazines with either a small donation of even £1, or a subscription to our magazine, which costs just £31.50 per year, (inc p&P and mailed direct to your door) your generosity will help us weather the storm and continue in our quest to deliver quality journalism.

As a subscriber, you will have unlimited access to our web site and magazine. You'll also be offered VIP invitations to our events, preferential rates to all our awards and get access to exclusive newsletters and content.

Just click here to subscribe and in the meantime may I wish you the very best.








Latest news

Related news