Tuesday, November 26, 2024

Andritz wins furnaces contract with Sheffield Forgemasters

International technology group, Andritz, is to supply new furnaces for the UK’s largest open die forge.

Following a formal tender process, Andritz, which has its headquarters in Austria, has received an order worth more than £20 million from Sheffield Forgemasters, to supply seven new furnaces for the company’s proposed 13,000 tonne forging line.

With no UK companies able to deliver furnaces of the size required within the time-frame and a number of large European suppliers also unable to meet the tender requirements, Andritz won the contract to supply three forging and four heat-treatment furnaces.

Steve Marshall, manufacturing transformation director at Sheffield Forgemasters, said: “The challenge of finding a company with the capability of delivering such large furnaces in the timeframe that we are working to has been substantial, with a number of Europe’s largest suppliers unable to tender against our scope and delivery requirements.”

The furnaces with up to 1,000 tonnes of capacity will feature rail-mounted ‘car-bottoms’ which can roll in and out for the loading of ultra-large components and adopt state-of-the-art burner technology for optimal efficiency.

Steve added: “The furnaces will be the mainstay of our new heavy forging line, delivering both heat-treatment and main forging heating cycles, using the latest burner technologies for optimum efficiency and heat control.

“Andritz demonstrated an ability to work with us on the scope and delivery of the seven major furnaces, crucial to bringing our new forging line into operation.

“New innovation in furnace technologies includes dual-fuel burners which can switch to hydrogen if the technology to move away from natural gas becomes viable.

“The largest furnace will measure 18.5m long x 9.4m wide x 8.1m tall and a separate tender process for smaller, ancillary furnaces for the forging line is underway and will be announced in due course.”

Advanced burners for the main forging furnaces will deliver up to 30 per cent reduction in primary heating gas consumption, a more consistent heat to the steel components and highly accurate temperature control.

The forging line will be serviced by seven overhead cranes, supplied by Jaso Industrial Cranes in a contract recently announced by Sheffield Forgemasters and work is underway to demolish existing buildings for the new 12,700 sq m forge facility.

The UK’s largest open die forge will replace the company’s existing 10,000 tonne forging press and will complement its smaller 4,000 tonne press to serve defence and commercial markets.

A message from the Editor:

Thank you for reading this story on our news site - please take a moment to read this important message:

As you know, our aim is to bring you, the reader, an editorially led news site and magazine but journalism costs money and we rely on advertising, print and digital revenues to help to support them.

With the Covid-19 pandemichaving a major impact on our industry as a whole, the advertising revenues we normally receive, which helps us cover the cost of our journalists and this website, have been drastically affected.

As such we need your help. If you can support our news sites/magazines with either a small donation of even £1, or a subscription to our magazine, which costs just £31.50 per year, (inc p&P and mailed direct to your door) your generosity will help us weather the storm and continue in our quest to deliver quality journalism.

As a subscriber, you will have unlimited access to our web site and magazine. You'll also be offered VIP invitations to our events, preferential rates to all our awards and get access to exclusive newsletters and content.

Just click here to subscribe and in the meantime may I wish you the very best.








Latest news

Related news